ROAD CONSTRUCTION & INFRASTRUCTURE
Kerb Stone Installation
Kerb stone installation defines the edge of a road or footpath and helps organise traffic, pedestrian space and surface drainage.
Overview
Kerbs create a durable line between the carriageway and adjoining areas. Accurate alignment and levels matter because the kerb also affects water flow and the finish of nearby paving. Jay Ambe offers kerb installation for new roads and site improvements, using the kerb type and setting method specified for the project. The work can be coordinated with footpaths, dividers and drainage.
Explore our Road Construction & Bitumen Work Specification for material and layer details, and see Our Equipment for the machinery behind the work.
Key capabilities
- Defined road and pedestrian edges
- Controlled alignment and levels
- Better coordination with surface drainage
- Neat transitions at entrances and junctions
Scope of work
- Set out the kerb line and finished levels.
- Prepare the foundation and bedding.
- Place precast kerbs or construct the specified edge.
- Align and secure units and complete joints or backing.
- Finish adjoining paving and check drainage paths.
Work process
- 01Set out
- 02Foundation
- 03Bedding
- 04Kerb installation
- 05Joint and level checks
Applications & site types
- Industrial roads
- Commercial access routes
- Residential streets
- Footpaths and parking edges
Frequently asked questions
Yes, where space, levels and the existing edge allow a suitable foundation.
They can guide surface water toward planned inlets or channels when levels are designed accordingly.
Yes. Entrance and crossing transitions can be included in the setting-out plan.
Related work & materials
Plan the right road-work scope.
Tell us about your site, expected use and preferred timeline. We can discuss a practical scope for the work.
