Formation and subgrade

Earthwork & bottom embankment

Earthwork creates a stable formation by controlling excavation, approved fill, layer thickness, moisture and compaction before the granular pavement layers are placed.

  • Site clearing and earth cutting
  • Approved-fill placement in layers
  • Moisture conditioning and compaction
  • Formation trimming and level checks

Execution approach

Typical work sequence

The final method, layer thicknesses, materials and inspection points are aligned with the approved drawings, specifications and actual site conditions.

01

Setting-out and cutting

Mark excavation limits and remove unsuitable or excess material.

02

Layer placement

Spread approved soil or fill material in controlled layers.

03

Moisture and compaction

Condition each layer and compact it to the specified requirement.

04

Formation approval

Trim the surface, verify line and level, and prepare for the road base.

Visual reference

Process and site record

Process illustration: earth cutting and formation preparation
Earth cutting and formation — process illustration
Process illustration: embankment soil laying and grading
Soil laying and grading — process illustration
Watering and moisture conditioning during embankment work
Moisture conditioning — supplied site photograph
Layer preparation during bottom embankment work
Layer preparation — supplied site photograph

The two process illustrations are identified in their captions; the remaining two images are client-supplied site photographs. Actual material approval and compaction testing follow the contract specification.