Road pre-construction service

Road survey, leveling & measurement

Accurate setting-out establishes the road alignment, formation levels, slopes and reference points needed before earthwork or pavement construction begins.

  • Centerline and boundary setting-out
  • Existing-ground level checks
  • Formation and finished-level control
  • Cross-fall and drainage coordination

Execution approach

Typical work sequence

The final method, layer thicknesses, materials and inspection points are aligned with the approved drawings, specifications and actual site conditions.

01

Reconnaissance

Review access, drawings, benchmarks and visible ground constraints.

02

Control points

Establish protected reference points and the working centerline.

03

Level checks

Record levels and cross-sections for earthwork and pavement planning.

04

Construction transfer

Transfer approved line and level information to the execution team.

Visual reference

Process and site record

Process reference: total-station survey and road alignment work
Total-station alignment reference
Process reference: road level measurement using a total station
Road-level measurement reference